UPSC CSE 2025 CSAT · Question 75
UPSC CSE 2025 CSAT question on Time Work Set Pipes
CSAT is a qualifying paper.
- ExamUPSC CSE - CSAT
- Year2025
- PaperCSAT (General Studies Paper II)
- SubjectBasic numeracy
- TopicTime and work
- DifficultyMedium
A set (X) of 20 pipes can fill 70% of a tank in 14 minutes. Another set (Y) of 10 pipes fills 3⁄8th of the tank in 6 minutes. A third set (Z) of 16 pipes can empty half of the tank in 20 minutes. If half of the pipes of set X are closed and only half of the pipes of set Y are open, and all pipes of the set (Z) are open, then how long will it take to fill 50% of the tank?
Show answer
Answer: D. 16 minutes
Solution
- Rate of one pipe (fraction of tank per minute):
- X: 20 pipes fill 70% in 14 min, so one pipe fills 0.7 ÷ (20 × 14) = 1⁄400.
- Y: 10 pipes fill 3⁄8 in 6 min, so one pipe fills (3⁄8) ÷ 60 = 1⁄160.
- Z: 16 pipes empty 1⁄2 in 20 min, so one pipe empties (1⁄2) ÷ 320 = 1⁄640.
- Open pipes: half of X = 10 pipes, half of Y = 5 pipes, all 16 of Z.
- X: 10 × 1⁄400 = 1⁄40. Y: 5 × 1⁄160 = 1⁄32. Z: 16 × 1⁄640 = 1⁄40 (emptying).
- Net rate = 1⁄40 + 1⁄32 − 1⁄40 = 1⁄32 of the tank per minute.
- Time for 50% = (1⁄2) ÷ (1⁄32) = 16 minutes.
Why the other options are wrong
- (a) 8 minutes: fills only 8⁄32 = 25% of the tank.
- (b) 10 minutes: fills 10⁄32 ≈ 31%.
- (c) 12 minutes: fills 12⁄32 = 37.5%.
Quick trick
- The half of X (fill 1⁄40) exactly cancels all of Z (empty 1⁄40), so only the 5 Y pipes count: 5⁄160 = 1⁄32 per minute, so 16 minutes for half.
Remember
Find the rate of a single pipe first, then scale by the number open; filling and emptying rates add with opposite signs.
Hence the answer is (d).
Share
Ask Atlas (5) for similar questions
- Time Work Complete Together — Same idea: individual fractional work rates combined over days to reach a target fraction.
- Time Work Complete Certain — Same pattern: three workers' fractional rates combined, then one leaves and the rest is finished.
- Time Work Data Inadequate — Same pattern: combining group rates of different worker types to find completion time.
- Time Work Certain Complete — Same work-rate scaling idea, asking how the number of workers must change for a new time.
- Time Work Completes Job — Same fraction-of-job idea, where the amount of work changes and the remaining time is asked.
← Full UPSC CSE 2025 CSAT paper · All Basic numeracy questions