UPSC CSE 2024 CSAT · Question 7

UPSC CSE 2024 CSAT question on Time Work Certain Complete

CSAT is a qualifying paper.

A certain number of men can complete a piece of work in 6k days, where k is a natural number. By what percent should the number of men be increased so that the work can be completed in 5k days?

  1. 10%
  2. (50/3)%
  3. 20%
  4. 25%
Show answer

Answer: C. 20%

Solution

  1. Let the number of men be M. Total work = M × 6k man-days.
  2. To finish in 5k days, men needed = (M × 6k) ÷ 5k = 6M⁄5 = 1.2M.
  3. Increase = 1.2M − M = 0.2M, which is 0.2 × 100 = 20% of M.
  4. Check with k = 1 and M = 10: work = 60 man-days. In 5 days, 60 ÷ 5 = 12 men are needed, an increase of 2 on 10, i.e. 20%.

Why the other options are wrong

  • (a) 10%: 1.1M men in 5k days do 5.5kM man-days, less than the 6kM needed.
  • (b) (50/3)%: this is the 16⅔% fall in days (from 6k to 5k, a drop of k on 6k), not the rise in men.
  • (d) 25%: 1.25M men in 5k days do 6.25kM man-days, more than needed.

Quick trick

  • Men and days are inversely proportional: days go 6 : 5, so men go 5 : 6, a rise of 1 on 5 = 20%. The k cancels.

Remember

If days fall in the ratio a : b, men must rise in the ratio b : a; percentage rise = (a − b)⁄b × 100.

Hence the answer is (c).

Share
Ask Atlas (4) for similar questions
  1. 2022 · Q57 Time Work Data Inadequate — Same work-and-men-days relationship; changing men and women counts alters completion time.
  2. 2021 · Q50 Time Work Completes Job — Same question pattern: change in work quantity or workforce alters required days.
  3. 2017 · Q54 Time Work Thrice Fast — Same time-and-work ratio reasoning, relating rates of several workers to shares.
  4. 2025 · Q75 Time Work Set Pipes — Same pipe-and-tank work-rate idea, combining sets with changed numbers of pipes open.

← Full UPSC CSE 2024 CSAT paper · All Basic numeracy questions